Representative corrosion control and coating projects executed with certified engineering oversight and genuine Jotun coating systems.

Jotun
Authorized Jotun Dealer Product Supply & Specification All project scopes can be provisioned with 100% genuine Jotun marine & protective coating systems with manufacturer batch test certificates.
Explore Jotun Systems →
Marine

Ballast tank & hull recoating programme

Specification and QA/QC oversight for Jotun SeaForce Shield antifouling and Jotamastic 90 surface-tolerant epoxy across ballast tanks and outer hull during scheduled dry-docking.

Jotamastic 90 + SeaForce Shield

Completed inside the docking window with zero rework on final inspection.

Oil & Gas

Storage tank external survey & recoat

Condition survey across a coastal tank farm, specifying Jotun Barrier zinc-rich primer and Hardtop XP aliphatic polyurethane to resist aggressive marine atmospheric exposure.

Jotun Barrier + Hardtop XP

Remediation budget reduced by deferring sound areas and targeting genuine risk.

Infrastructure

Bridge steelwork protection

Specification and application oversight of a high-durability ISO 12944 C5-M system with Jotun Barrier Plus primer and Jotamastic 90 high build epoxy on structural steelwork.

Jotun ISO 12944 C5-M System

System specified for a 25-year first-maintenance interval.

Power Generation

Applicator training programme

Paint School delivery for an in-house maintenance crew, combining classroom theory on Jotun high-solids epoxies with supervised practical application and DFT gauge verification.

Jotun Coating Application Standards

Measurable fall in application defects on the following shutdown.

Petrochemical

Contractor qualification & batch audit

Technical capability assessment of tendering painting contractors, including Jotun factory batch verification, surface profile testing, and calibrated climate recording.

Jotun Batch MTR Verification

Award decision supported by documented, defensible technical evidence.

Water & Wastewater

Tank lining failure analysis

Investigation of premature lining failure in a potable water tank, followed by specification of approved Jotun Tankguard lining with root-cause reporting.

Jotun Tankguard Chemical Lining

Failure traced to preparation, not product — repair scoped accordingly.